Routes 105. 106, and Green Line detour: St. Mary’s Construction Road Closure Continues

Further work for the demolition of the former St. Mary’s building will cause road closures that will create a detour for “To Downtown” Routes 105, 106, and Green Line. This detour  is scheduled to last until Friday, February 7th.

Routes 105, 106, and Green Line TO DOWNTOWN: From 6th Ave E downhill at 5th St, detour by turning right onto 5th St, follow 5th St to 5th Ave E and turn left, follow 5th Ave E to 4th St noting the temporary stop on 5th Ave E before 4th
St, turn right onto 4th St, provide service at 4th St and 4th Ave E as needed, DO NOT provide service at 2nd Ave E and 4th St, but instead turn left down 2nd Ave E and follow to resume current downtown routing.
Routes 105, 106, and Green Line

FROM DOWNTOWN: No detour needed

 

you're currently offline